Beulah Hill, South London
Charles Edward Limited, a construction firm, delivering turnkey fit out, refurbishment and new build projects across London, the South East and beyond, is redeveloping a sloping site at Beulah Hill in South London.
Charles Edward Limited, a construction firm, delivering turnkey fit out, refurbishment and new build projects across London, the South East and beyond, is redeveloping a sloping site at Beulah Hill in South London.
The proposed building will cut into the slope, which is particularly steep, so required a contiguous pile retaining wall on the two uphill sides to allow the site to be excavated safely. The piles have a capping beam at the top which required propping whilst in the temporary situation.
Experience makes the appointment
PDMA Consulting Engineers, the temporary works specialist with a great deal of experience designing similar projects, was appointed by Charles Edward Limited (CEL) to design the propping system and to detail the reinforcement in the capping beam to suit.
The props are up to 35m long and it was possible to use only two props in the temporary situation to offer the least obstruction to the permanent works to be undertaken. However, the capping beam carries large bending moments and shear forces between the props, which required a change in the design.
PDMA re-detailed the reinforcement of the capping beam to suit these load effects, which in places required two layers of 8no H40 bars in each face. We also specified 10mm aggregate to help achieve full embedment of the bars in the concrete.
From a different angle
On this project PDMA specified props from RMD Kwikform’s Tubeshor hybrid hydraulic tubular shoring system, ideally suited due to their unrivalled axial load capacity and high axial stiffness. The angle between the prop and the capping beam is about 45° but varies both horizontally and vertically due to the geometry of the permanent works.
Beulah Hill, South London
Ground support for an excavation
The building will cut into a steep slope, so required a contiguous pile retaining wall on the two uphill sides to allow the site to be excavated safely
Tubeshor 610 & 1060
With the heavy reinforcement and high prop loads it would have been difficult to post-drill fixings for the props, so we specified reinforced concrete corbels to be cast at the same time as the capping beam. The angle and size of the faces were dimensioned to suit the exact angle of each prop.
However, experience dictates that nothing on a site will ever be exact, so the use of the RMD spherical bearings at the end of each prop, which offer 5 degrees of rotational freedom in any plane, provides additional assurance that the props will fit perfectly.
To further ensure a good fit, the inner section of each prop extends by up to 800mm and is threaded to enable mechanical lock-off using a screwed collar. This arrangement removes the need to rely on hydraulics only for the duration and increases the allowable working load for each prop to 4500kN.
Article by PDMA Consulting Engineers.