Our Hybrid Hydraulic Tubular Shoring System is used for propping waler beams or capping beams of large excavations. It comes in a range of diameters to cater for all your heavy-duty shoring requirements. An integral hydraulic ram unit is rated for an AWL of 2500 kN rising to 4500 kN once the unique mechanical lock off collar is engaged.

Faster

High strength capability of Tubeshor means fewer struts are needed and assembly time can be reduced, saving time and money.

Safer

All major components have robust integral lifting points for safer handling. Integral forklift points/stands and rotation stops enable safe storage of stacked sections.

Easier

Very few different components make it easy and faster to assemble. With four diameters of Tubeshor, the versatility to support your requirements is assured.

Key features

  • Versatile
    Tubeshor is available in four diameters – 320, 460, 610, 1060 which can all be simply bolted to one another using accessories to create required lengths.
  • Robust Construction
    Heavy duty construction using high grade steels, designed to be less prone to damage.
  • Economical Alternatives
    Burnout Packs and Weldable Stubs facilitate reduced cost options for versatile and economical longer-term propping solutions.
  • Innovative Design
    Additional bottom bolts in the flange joint boost performance in horizontal applications and tapered pre-camber shims reduce self-weight deflection on horizontal struts, increasing allowable prop loads.
  • Increased stiffness under load
    Has market leading stiffness due to its ability to isolate and lock off the hydraulic element of the prop.
  • Fine Length Adjustment
    Tubeshor 460, 610 and 1060 are compatible with hydraulic ram units that provide fine length adjustment, hydraulic preload, lifting/lowering of load and load release.
  • Economical Alternatives
    Burnout Packs and Weldable Stubs facilitate reduced cost options for versatile and economical longer-term propping solutions.
  • Load Monitoring
    Live load monitoring up to 9000kN using wireless e-Pins to feed on-line data and providing appropriate trigger alerts.
Altrad RMD Kwikform CPC Civils project

CPC Civils Water Network Expansion

G-TEM's Manufacturing Facility

Got a question? Get in touch to speak to one of our specialists

    Preferred contact method

    Details

    Please fill out your details to access this download.
    Alternatively, you can login with your LocusID.

      ALTRAD RMD Kwikform
      Privacy Overview

      This website uses cookies so that we can provide you with the best user experience possible. Cookie information is stored in your browser and performs functions such as recognising you when you return to our website and helping our team to understand which sections of the website you find most interesting and useful.