Ground shoring solution to support a 10m deep shaft excavation

Civil engineering and groundworks contractors, CPC Civils, required a 10-metre deep excavation to facilitate the installation of a new replacement pipeline.

This launch pit shaft would be the initial stage of a tunnelling project under the Shropshire Union canal on the Peckfoproduct-type/ground-shoring/rton to Coopers Green Resilience Scheme, for Severn Trent Water.

The contractor required a shaft excavation solution that would ensure maximum safety and efficiency on site. In short, a trustworthy partner was needed. That’s why CPC approached RMD Kwikform to supply its new ground shoring fleet.

As the only supplier in the market that offers a fully CE-marked ground shoring fleet, it gave the team confidence that the shaft excavation equipment had been designed and manufactured to the highest level of European standards.

“My priority is safety,” said site agent, Will Roach. “I want to know that the kit installed on site will ensure the safety of my team at all times, and the fact that the kit is CE-marked helps give us that reassurance.”

RMD Kwikform groundworks on CPC Civils

RMD Kwikform supplied over 550 pieces of equipment to the site for the shaft excavation, including products from its GeoBrace hydraulic framing and Tubeshor propping system. This solution is the first hydraulic bracing system with a mechanical lock-off system and features seven varying lengths of leg extension.

Designed specifically for large excavations, the prop can span up to 30 metres and will support up to 3000 kN in horizontal applications. All of the ground shoring equipment has been designed using Finite Element Analysis and boasts additional stands and stops to ensure the safe handling, assembly and dismantling of equipment.

Commenting on what makes RMD Kwikform attractive as a ground shoring solutions provider, Roach said:

“I have a very good relationship with RMD Kwikform. They have attracted experts I’ve worked with at other ground engineering companies and knowing the experience they have and the trust I have in the team, it made them the natural choice for our project."

Location

Shrewsbury, UK

Application

Excavation

Challenge

The key factor here was health and safety, the customer wanted complete assurance that the team on site would be able to operate safely. With our CE-marked fleet and advanced design features, we delivered on the customer's challenges.

Solution

Ground shoring, heavy-duty propping, and propping

Products used

Got a question? Get in touch to speak to one of our specialists

    Preferred contact method
    ALTRAD RMD Kwikform
    Privacy Overview

    This website uses cookies so that we can provide you with the best user experience possible. Cookie information is stored in your browser and performs functions such as recognising you when you return to our website and helping our team to understand which sections of the website you find most interesting and useful.