Rapidclimb equipment provides a crane lifted jump formwork system providing safe, self contained working levels for economical core construction and multi-lift wall structures.

Faster

Speeds up concrete cycle, reducing programme time on multi-floor builds.

Safer

Self-contained working levels for economical core forming.

Easier

Integral vertical adjustment jack for fine levelling of shutter relative to platform.

Key features

  • Staged construction process
    Allows balance of site resources.
  • Trolley mounted formwork panel
    Retracts the form face, providing space for cleaning and steel fixing of concrete.
  • Formwork and access platforms are lifted as one
    Which minimises crane support and reduces labour and material costs.
  • Fine adjustments of the form face can be made during construction
    Provides an accurate alignment of the form face vertically and laterally.
  • Rigid steel construction
    Can handle wall forms up to 5.4m high.
  • Trailing platform option
    Complete any rectification or finishing activities for areas below the current pour utilising the form itself.
  • Anchor accessories can be reused after each pour
    Reduces material costs on current and future construction programmes.
Image of construction of mall of Egypt ski park

Mall of Egypt

Got a question? Get in touch to speak to one of our specialists

    Preferred contact method

    Details

    Please fill out your details to access this download.
    Alternatively, you can login with your LocusID.

      ALTRAD RMD Kwikform
      Privacy Overview

      This website uses cookies so that we can provide you with the best user experience possible. Cookie information is stored in your browser and performs functions such as recognising you when you return to our website and helping our team to understand which sections of the website you find most interesting and useful.