Qatar Railway’s (FYAP JV) Doha Metro is a rapid transit system that has become an integral component of the country’s rail infrastructure.

With state-of-the-art stations, driverless trains, and seamless integration into the larger Qatar Rail network, the Doha Metro has quickly grown to be renowned all over the world. The construction of the Red Line South (RLS) Elevated and At-Grade section of the project was led by FYAP JV, consisting of FCC, Archirodon, Yuksel, and Petroserv.

The RLS metro construction project included the creation of a 5.8 km viaduct at a grade line of 0.4 km; three elevated stations with one at grade; and a 1 km underpass structure. As one of the elevated sections across the entire Doha Metro project, FYAP JV turned to RMD Kwikform to provide the solution to support the in-situ bridges and stations.

Ahmed Awaly from RMD Kwikform said: “The overall design process was very complicated as the project was divided into several subprojects, each with its own team and challenges. As the soffits sloped in all different directions across each section of the bridge, at tender stage, we worked closely with FYAP JV’s technical, planning and construction teams to determine which system would accommodate every element of the project.”

Construction of the Doha Metro

In the first instance, due to the elevation and varying slopes of the soffit, RMD Kwikform produced 3D designs and conducted 3D frame analysis to create a solution that was fit for all sub-project teams, using only standard components. In total RMD Kwikform delivered 3,536 tonnes of equipment to site to support the metro construction project; this included Megashor and Kwikstage, Rapidshor, GTX and Aluminium Beams and Superslim Soldiers.

Ahmed continued:

“We provided our heavy-duty Megashor system to support the launching gantries during their erection and at the passing of one of them above the 13-metre bridge deck. As the system can be adjusted to support various heights and lengths, and due to its high load capacity, Megashor granted each team flexibility and stability. For the large piers, we used Megashor legs and steel Superslim Soldiers to laterally support the permanent works.

RMD Kwikform Shoring on the Doha Metro

“Rapidshor, Superslim Soldiers and Alform aluminium beams were also used in tandem to provide support for the construction of Al Wakra Station. Using the Rapidshor tilting heads, the curvature and sloping segments of the bridge were accommodated without additional support or timber wedges.”

Location

Doha, Qatar

Application

Construction of in-situ bridges and stations for the Doha Metro

Challenge

Soffits sloped in different directions across all sections of the bridge, making the design and construction process more difficult than usual. Several project teams had to be liaised with in order to ensure all parts of the construction were standardised. Strict project timelines and the proximity to nearby busy streets were additional challenges.

Solution

Formwork and shoring

Products used

By using only ‘standard’ kit, instead of specially designed solutions, the site team were able to erect the equipment faster and safely; this was essential due to the strict project timelines and the proximity to nearby busy streets in Doha and Al Wakra. The RMD Kwikform site assistance team were also a constant presence on-site to provide training and ongoing support during both the metro construction and the metro bridge construction segments of the project.

Of the other challenges faced, Ahmed said: “Alongside the design complications, another challenge we faced was effectively managing the logistics and delivery of all equipment. On securing the project, we assigned a dedicated team to manage each facet of the project, from engineering, training, customer service and logistics.

“Despite the volume of drawings and materials being delivered to site, all within an incredibly tight programme, FYAP JV handed over the superstructure to Qatar Railways on time. The entire team at RMD Kwikform is extremely proud to have been involved in this project and contributed to its success.”

Got a question? Get in touch to speak to one of our specialists

    Preferred contact method
    ALTRAD RMD Kwikform
    Privacy Overview

    This website uses cookies so that we can provide you with the best user experience possible. Cookie information is stored in your browser and performs functions such as recognising you when you return to our website and helping our team to understand which sections of the website you find most interesting and useful.